the Device of the bases

Excavations

drilling and piling piles Within the framework of excavations performed works on processing a ground. Processing of a ground includes the following basic processes:

· development of a ground

· moving of a ground

· stacking of a ground

· condensation of a ground

To direct performance of these processes in some cases precedes or preparatory and auxiliary processes accompany. Preparatory processes are carried out prior to the beginning of development of a ground, and auxiliary - up to or during erection of earthen constructions.

The ground is processed by the mechanized way with the help of various digging, землеройно-transport machines, means of hydromechanization, drilling, and as in the explosive way.
Works concern to excavations on fastening a ground also:

· cementation ground;

· silication ground

· chemical fastening ground

At carrying out of excavations physicomechanical properties ground are taken into account: volumetric weight, humidity, force of internal coupling of particles, loosen.

THE ZERO CYCLE

To works on a zero cycle concern:

· breakdown and digging of trenches, foundation ditches for the device of the bases

· transportation of a ground

· a lining of pipelines and a cable network

· return backing a ground

· the device of an embankment with condensation.

Depending on a kind of construction the zero cycle can make from five up to fifteen percent of all works on object.

THAT WAS

Устройство the bases

Kiev street Shota Rustavely 38. A monument of architecture - replacement of the bases at living tenants 1 floor, multiroom public. 1997. Customer ABSOLUT HOLDING Poland

THAT HAS TURNED OUT

Нулевой a cycle

street Shota Rustavely 38. Interior of furniture - ERGO, then School desks two ground floors with a mezzanine. 1998. Customer ABSOLUT HOLDING Poland

; THE WALL IN ;



The device of a protecting design ; a wall in ; (monolithic, сборно-monolithic, monolithic-combined team water-proof with application bushing key").

· antifiltration veils in the way ; a wall in ; (clam-shell and a mill);

· bearing ferro-concrete underground constructions in the way ; a wall in

· protecting ferro-concrete underground constructions in the way ; a wall

DRILLING AND piling PILES



1. Arrangement of chinks is carried out with the subsequent installation in them:

· steel pipes;

· pipe beams;

· pumps of water-downturn;

· earth anchors;

· piezometer;

· return plumbs.

2. oil-rig piles:

· the device vertical oil-rigх piles;

· the device inclined oil-rig piles (up to 45 °).



3. driving piles:

· immersing of simple ferro-concrete piles;

· immersing of compound ferro-concrete piles;

· immersing steel matched piles;

· immersing of piles from steel pipes and beams.

4. printedes piles

· the device ferro-concrete printedes piles without widening the bases;

· the device ferro-concrete printedes piles with widening the bases

5. Screwed up piles:

· screwing up piles from steel pipes;

· screwing up piles from steel pipes with the subsequent filling a cavity of a pipe reinforcing skeleton and concrete.

6. The device groove protections

THAT WAS

Kiev street Shota Rustavely 38. A monument of architecture - sectional replacement of the bases at living tenants 1 floor, multiroom public. 1997. Customer ABSOLUT HOLDING Poland

THAT HAS TURNED OUT

Kiev street Shota Rustavely 38. Interior of furniture - ERGO then School desks - two ground floors with a mezzanine.

Customer ABSOLUT HOLDING Poland

BUILDING WATER-DOWNTURN



The device and operation of systems of water-downturn:

· deep;

· well point;

· vacuum.

DRAINAGES



The device of drainages of various purpose.

The listed kinds of special excavations allow to carry out: 1. Protecting designs of foundation ditches from:

· pipes:

· beams;

· steel groove piles:

· walls in

· hole piles;

· tangent ramming injection piles.

2. Amplification of the existing bases of buildings:

· injection borax piles;

· (screwed up piles);

· fastening soil.

3. The device of the pile bases from:

· forepole piles;

· ramming piles;

· injection borax piles;

· screwed up piles.

4. The device of the bases in the way ; a wall in

5. The device antifiltering veils:

· a method *quot; a wall in ;

· immersing steel groove piles

· cementation and in other ways of fastening ground.

6. Water-downturn.

7. Fastening ground.

8. Fastening of retaining walls by earth anchors.

Address to us on ph.: 403-61-09 ; 501-10-60 (multichannel)



Address to us on ph.: 501-10-60 ; (multichannel); 403-61-09



| Gallery of objects | *nbsp; *nbsp; *nbsp; | our clients | *nbsp; *nbsp; *nbsp; | Responses of clients |

| Reference book | | Catalogue | | Rating | | Article | | Dictionary | | Terms | | Styles | | Standardization and sertification | | Quality | | ZHEK | | Management project | | Emergency services | | Anecdotes | | Prays |
| Facilities | | Clients | | Reviews | | Foto Gallery | | For presses | | Main | | Map | | Russian | | Exchange links | | Advertisment | | Contacts | | Catalogue useful resource |



© 2005 Proxima. All rights reserved.
When use material reference to site obligatory.
 
        Facilities


Construction of the houses
Designing the cottages
Design interior
Repair of the
offices

Repair of the apartments
Designing the sanitary systems
  (ОВ, ВК)

Montage electro-technical networks
Designing the electric systems
Ready projects of the cottages
Types to activity

 

   
Exchange links