- the Boiler - is selected by results of heat engineering calculation proceeding from total loading on system of heating, hot water supply (HWS), heating waters in pool, etc.
- the Heat-sink tank (boiler) for preparation of hot water - is selected proceeding from charge HW, number of bathrooms, quantity living in the house.
- the Circulating pump for system of heating.
- the Circulating pump for a heating contour of a boiler.
- the Circulating pump for contour HW of a boiler (recirculation).
- Circulating pumps for other possible contours (warm floors, heat exchanger pool, heat exchanger systems of ventilation, etc.).
- Extended a tank for system of heating.
- Extended a tank for system GVS.
- Armature for safety and the control of system.
- the Запорно-regulating equipment.
- Regulating thermostates (the type and quantity{amount} is selected depending on the accepted circuit stud by boiler-house).
The configuration of system of heating (type and quantity of radiators and roller towel, distributing and a material of pipes, presence of warm floors, etc.) is selected individually in view of wishes of the customer and a design of a house (architectural decisions, a material of walls and overlappings{blockings}, the design - project).
Preparation of buildings for a cold season
- washing of system of heating
- hydrostatic tes systems of heating
- replacement of faulty heating devices and sites of pipelines
- adjustment of system of heating
Delivery of a heating system to area under the act
Examples of circuits of system of heating
- the Basic circuit hydraulic stud the equipment of boiler-house.
- Accommodation of radiators.
- Accommodation of warm floors.
- the Axonometrical circuit of system of heating.
Comparison of systems of heating as the energy carrier
| Type of the energy carrier |
Advantages |
Lacks |
| Gas |
- the cheap energy carrier;
- silent work of boilers with an atmospheric torch;
- an opportunity of work without an electricity.
|
- the coordination of gas trust is required;
- in the winter during peak loadings because of pressure drop in a gas network decrease in capacity of the boiler is possible.
|
| the Electricity |
- compactness;
- simplicity of installation;
- simplicity of service;
- availability of the energy carrier;
- does not demand allocation of a special premise under boiler-house;
- ecological compatibility;
- the flue is not necessary.
|
- the expensive energy carrier;
- demand, as a rule, three-phase connection and allocation of additional electric capacity.
|
| Diesel fuel |
- an opportunity further of transition to gas fuel, having replaced only a torch, and not changing the boiler.
|
- the expensive energy carrier;
- increase in capital expenses because of necessity of the device of a warehouse for storage of fuel.
|
| Firm fuel |
- low capital expenses;
- the cheap energy carrier;
- an opportunity of work without an electricity;
- an opportunity of transition to other type of the energy carrier by installation on the boiler of a diesel or gas torch (if it is stipulated by a design of the boiler).
|
- absence of an opportunity of work in an independent mode;
- demands often service, constant cleaning.
|