No. Pos.
|
Denomination
|
Units of Measurement
|
Price $
|
| . |
Floors |
. |
. |
| 1 |
Wet seal |
M2 |
2 |
| 2 |
Cement covering facility |
M2 |
4 |
| 3 |
Facility for expanded-clay lightweight concrete preparation |
M3 |
25 |
| 4 |
Covering grouting by uniground |
M2 |
0,3 |
| 5 |
Covering facility from ceramic
tiles |
M2 |
7 |
| 6 |
Laying of block parquet on veneer |
M2 |
9,5 |
| 7 |
Arrangement of floor from
laminated parquet |
M2 |
4 |
| 8 |
Arrangement of carpet coating |
M2 |
1,5 |
| 9 |
Arrangement of coating from linoleum |
M2 |
1,5 |
| 10 |
Floor polishing |
M2 |
2,5 |
| 11 |
Varnish painting of floor for
3 times |
M2 |
2,5 |
| 12 |
Mounting baseshoe |
M |
1,2 |
| 13 |
Arrangement of tiles baseshoe |
M |
2,5 |
| 14 |
Arrangement of threshold strip |
M |
1,1 |
| 15 |
Arrangement of door rods |
Pc |
1,2 |
| . |
Ceilings |
. |
. |
| 1 |
Arrangement of gypsum-board one-level ceiling |
M2 |
6 |
| 2 |
Arrangement of gypsum-board multi-level ceiling |
M2 |
9 |
| 3 |
Wallpapers lining |
M2 |
2 |
| 4 |
Filling of gypsum-board surface with putty |
M2 |
2 |
| 5 |
Surface priming |
M2 |
0,5 |
| 6 |
Painting by water-emulsion paint for 2 times |
M2 |
2 |
| 7 |
Surface drying oil application |
M2 |
0,5 |
| 8 |
Painting by enamel for 2 times |
M2 |
2,5 |
| 9 |
Mounting of decorative cornice |
M |
1,1 |
| 10 |
Arrangement of w/sand plaster |
M2 |
4 |
| 11 |
Arrangement of heat and sound
insulation |
M2 |
1,2 |
| . |
Walls and partitions |
. |
. |
| 1 |
Arrangement of brickwork by 0,5 brick |
M2 |
4 |
| 2 |
Arrangement of partition from foam block |
M2 |
3,8 |
| 3 |
Arrangement of partition from gypsum-board construction 100 |
M2 |
5 |
| 4 |
Arrangement of wall-to gypsum-board construction |
M2 |
4,8 |
| 5 |
Filling of gypsum-board surface with putty |
M2 |
1,8 |
| 6 |
Arrangement of lime-mortar plaster |
M2 |
3 |
| 7 |
Arrangement of plaster by cement-sand solution |
M2 |
3,5 |
| 8 |
Arrangement of w/sand plaster |
M2 |
2 |
| 9 |
Arrangement of patterned plaster |
M2 |
4,5 |
| 10 |
Surface priming |
M2 |
0,5 |
| 11 |
Wallpapers lining |
M2 |
2 |
| 12 |
Painting by water-emulsion paint for 2 times |
M2 |
3 |
| 13 |
Painting by enamel for 2 times |
M2 |
1,5 |
| 14 |
Lining by ceramic tiles |
M2 |
2,5 |
| 15 |
Lining by trimstone |
M2 |
7 |
| 16 |
Arrangement of sheathing by wooden bars |
M2 |
8,5 |
| 17 |
Walls painting by paints
with decorative effect |
M2 |
4,5 |
| . |
Openings |
. |
. |
| 1 |
Arrangement of opening in brick wall |
M3 |
30 |
| 2 |
Arrangement of opening in concrete wall |
M3 |
50 |
| 3 |
Arrangement of opening in brick partition |
M2 |
5 |
| 4 |
Arrangement of jambs from gypsum-board construction |
M2 |
6 |
| 5 |
Arrangement of jambs plaster |
M |
7 |
| 6 |
Supply of jumper from metal bars |
Pc |
20 |
| 7 |
Mounting of metal door 30 x 30 |
Pc |
4 |
| 8 |
Mounting of window blocks |
M2 |
9 |
| 9 |
Mounting of door blocks |
Pc |
20 |
| 10 |
Mounting of casing |
M |
1 |
| 11 |
Mounting of window-sills |
M |
4,5 |
| 12 |
Mounting of cast from galvanized steel |
M |
1,5 |
| . |
Electrical engineering works |
. |
. |
| 1 |
Arrangement of mounting boxes |
Pc |
1,5 |
| 2 |
Arrangement of distribution boxes
|
Pc |
1,5 |
| 3 |
Mounting of sockets |
Pc |
1,5 |
| 4 |
Mounting of TV sockets |
Pc |
1,5 |
| 5 |
Mounting of phone sockets |
Pc |
1,5 |
| 6 |
Mounting of PC sockets |
Pc |
1,8 |
| 7 |
Mounting of switches |
Pc |
1,5 |
| 8 |
Mounting of point luminaire |
Pc |
3 |
| 9 |
Mounting of luminescent luminaire |
Pc |
3,5 |
| 10 |
Mounting of chandelier |
Pc |
12 |
| 11 |
Mounting of house phone |
Set |
15 |
| 12 |
Mounting of electric cabinet for 12 groups |
Pc |
25 |
| 13 |
Mounting of collective automatic circuit-breakers |
Pc |
3 |
| 14 |
Mounting of input circuit-breaker |
Pc |
5 |
| 15 |
Laying of electric wire |
M |
0,5 |
| 16 |
Laying of TV cable |
M |
0,5 |
| 17 |
Laying of phone wire |
M |
0,5 |
| 18 |
Laying of PC wire |
M |
0,5 |
| . |
Sanitary engineering works |
.. |
. |
| 1 |
Mounting of heating appliance |
Pc |
30 |
| 2 |
Mounting of stop fittings |
Pc |
4 |
| 3 |
Mounting of bath |
Set |
40 |
| 4 |
Mounting of closet basin |
Pc |
20 |
| 5 |
Mounting of shower cubicle |
Set |
40 |
| 6 |
Mounting of hand-wash basin |
Pc |
20 |
| 7 |
Mounting of mixer |
Pc |
9 |
| 8 |
Mounting of siphon |
Pc |
4 |
| 9 |
Mounting of volume water-heater |
Pc |
20 |
| 10 |
Arrangement of outputs for
washing machine |
Set |
20 |
| 11 |
Arrangement of outputs for kitchen |
Set |
25 |
| 12 |
Laying of plastic tube 20 |
M |
2 |
| 13 |
Laying of polyvinylchloride (PVC) tube 50 |
M |
2 |
| 14 |
Laying of polyvinylchloride (PVC) tube 100 |
M |
2 |
| 15 |
Laying of steel tube |
M |
2 |
| 16 |
Mounting of exhaust fan |
Pc |
4,5 |
| 17 |
Laying of air duct 100 |
M |
2 |
| 18 |
Mounting of registers |
Pc |
3 |
| 19 |
Mounting of towel drier |
Pc |
30 |
| 20 |
Filter mounting |
Pc |
5 |
| 21 |
Mounting of check valve |
Pc |
5 |
| 22 |
Mounting of water meter |
Pc |
10 |